MSU Chilled Water Loop Upgrades

Summer of 2018 – MSU Chilled Water Loop Upgrade project included horizontal drilling of two 24″ HDPE pipes from Herbert Hall  to McCarthy Hall below the ‘Drill Field.’ Over 3,600′ of piping was installed with almost zero impact to...
EMCC Student Union

EMCC Student Union

EMCC Student Union to open August 2016 at the Mayhew, MS campus. Work includes site utilities, plumbing, and 150 ton, ground loop geothermal HVAC system....
Davis Wade Stadium

Davis Wade Stadium

Brislin, Inc. was contracted to perform the mechanical installations and renovations at Davis Wade Stadium @ MSU. This exciting project was completed in two years with a renovation to the West side restrooms, food services, and concourse drainage. The North bowl was...